{"id":43947,"date":"2020-08-10T13:21:44","date_gmt":"2020-08-10T16:21:44","guid":{"rendered":"https:\/\/www.sinergiacut.org.br\/?p=43947"},"modified":"2020-08-10T13:23:20","modified_gmt":"2020-08-10T16:23:20","slug":"aprovado-edital-de-leilao-de-transmissao-com-r-74-bi-em-investimentos-previstos","status":"publish","type":"post","link":"https:\/\/sistema.sinergiacut.org.br\/?p=43947","title":{"rendered":"Aprovado edital de leil\u00e3o de transmiss\u00e3o com R$ 7,4 bi em investimentos previstos"},"content":{"rendered":"<div class=\"journal-content-article\">\n<div class=\"noticia-completa\">\n<div class=\"conteudo-noticia\">\n<div class=\"container-imagem\"><img class=\"alignleft\" title=\"Leil\u00e3o de Transmiss\u00e3o n\u00ba 1\/2020\" src=\"https:\/\/www.aneel.gov.br\/documents\/656877\/19631223\/Aprovado+edital+de+leil%C3%A3o+de+transmiss%C3%A3o+com+R%24+7%2C4+bi+em+investimentos+previstos\/fb68feea-6f93-dbd3-73ea-0da1e78f564a?t=1596733630191\" alt=\"Leil\u00e3o de Transmiss\u00e3o n\u00ba 1\/2020\" width=\"145\" height=\"79\"><\/div>\n<p class=\"caps\">A Ag\u00eancia Nacional de Energia El\u00e9trica \u2013 ANEEL aprovou nesta quinta-feira, 6\/8, o Edital do Leil\u00e3o de Transmiss\u00e3o n\u00ba 1\/2020, com previs\u00e3o de R$ 7,4 bilh\u00f5es em investimentos e gera\u00e7\u00e3o de 15.434 empregos diretos. Ser\u00e3o negociados no certame 11 lotes, com a contrata\u00e7\u00e3o de 1.958 km de novas linhas de transmiss\u00e3o e 6.420 megavolt-amp\u00e8res (MVA) em capacidade de transforma\u00e7\u00e3o. O leil\u00e3o est\u00e1 previsto para 17 de dezembro na sede da B3, em S\u00e3o Paulo.<\/p>\n<p>\u201cClassifico a delibera\u00e7\u00e3o de hoje como a contribui\u00e7\u00e3o do setor el\u00e9trico brasileiro para a agenda do Brasil sair da crise\u201d, declarou o diretor-geral da ANEEL, Andr\u00e9 Pepitone.<\/p>\n<p>\u201cA ANEEL e o Minist\u00e9rio de Minas e Energia d\u00e3o aqui o primeiro passo para a contribui\u00e7\u00e3o para a retomada da economia brasileira, por meio de investimentos em infraestrutura, com gera\u00e7\u00e3o de renda, de empregos e sobretudo com a gera\u00e7\u00e3o de um setor el\u00e9trico mais&nbsp; forte, confi\u00e1vel, com sistema de transmiss\u00e3o mais robusto e que propiciar\u00e1 desenvolvimento ao nosso pa\u00eds\u201d, afirmou o diretor relator do tema, Efrain Cruz.<\/p>\n<p>Os lotes compreendem investimentos em nove estados: Amazonas, Bahia, Cear\u00e1, Esp\u00edrito Santo, Goi\u00e1s, Mato Grosso do Sul, Minas Gerais, Rio Grande do Sul e S\u00e3o Paulo. Os dois \u00faltimos s\u00e3o os estados com o maior n\u00famero de novas instala\u00e7\u00f5es a serem licitadas. Os prazos de conclus\u00e3o das obras variam de 42 a 60 meses.<\/p>\n<p>Dois lotes apresentam empreendimentos de revitaliza\u00e7\u00e3o de instala\u00e7\u00f5es. O objeto do lote 5 \u00e9 a Subesta\u00e7\u00e3o 230\/13,8 kV Porto Alegre 4, atualmente gerida pela Companhia Estadual de Gera\u00e7\u00e3o e Transmiss\u00e3o de Energia El\u00e9trica \u2013 CEEE-GT. Os empreendimentos que comp\u00f5em o Lote 11, atualmente sob responsabilidade da Amazonas-GT, ser\u00e3o leiloados tendo em vista que a concession\u00e1ria optou por n\u00e3o renovar o contrato de concess\u00e3o. O vencedor do lote 11, al\u00e9m das novas instala\u00e7\u00f5es, receber\u00e1 a administra\u00e7\u00e3o, opera\u00e7\u00e3o e manuten\u00e7\u00e3o das existentes, al\u00e9m da atribui\u00e7\u00e3o de revitalizar essas instala\u00e7\u00f5es.<\/p>\n<p>Durante a vota\u00e7\u00e3o do tema, a Diretoria Colegiada da ANEEL concordou em incluir no texto do voto o impedimento de que as concess\u00f5es a serem licitadas passem por transfer\u00eancia de controle antes da entrada em opera\u00e7\u00e3o comercial.<\/p>\n<p>O edital segue para verifica\u00e7\u00e3o do Tribunal de Contas da Uni\u00e3o. Caso haja altera\u00e7\u00f5es, ser\u00e1 novamente apreciado pela Diretoria Colegiada da ANEEL em novembro pr\u00f3ximo. O texto aprovado considerou 500 sugest\u00f5es da sociedade, obtidas por meio da Consulta P\u00fablica n\u00ba 46\/2019, realizada em duas fases \u2013 de 20 de dezembro de 2019 a 3 de fevereiro 2020, com 18 participantes, e de 14 de maio a 29 de julho de 2020, com 29 participantes.<\/p>\n<p>Veja abaixo a lista de empreendimentos a serem licitados:<\/p>\n<table width=\"100%\" cellspacing=\"0\" cellpadding=\"0\" border=\"0\">\n<tbody>\n<tr>\n<td>\n<p align=\"center\"><strong>Lote<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"center\"><strong>Empreendimentos<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"center\"><strong>UF(s)<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"center\"><strong>Prazo (meses)<\/strong><\/p>\n<\/td>\n<td>\n<p align=\"center\"><strong>Finalidade<\/strong><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>1<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 500 kV Silva\u0302nia &#8211; Trindade, C1, com 155 km;<\/p>\n<p>\u2013 SE 500 kV Silva\u0302nia;<\/p>\n<p>\u2013 Trechos de LT 500 kV entre a SE Silva\u0302nia e a LT Samambaia &#8211; Emborcac\u0327a\u0303o, C1, com 2 x 7,14 km;<\/p>\n<p>\u2013 Trechos de LT 500 kV entre a SE Silva\u0302nia e a LT Samambaia &#8211; Itumbiara, C1, com 2 x 14,37 km.<\/td>\n<td>\n<p align=\"center\">GO<\/p>\n<\/td>\n<td nowrap=\"nowrap\">\n<p align=\"center\">48<\/p>\n<\/td>\n<td>Atendimento ao crite\u0301rio N-1 na Rede Ba\u0301sica que atende a\u0300 regia\u0303o central do estado de Goia\u0301s com novo ponto de conexa\u0303o ao sistema em 500 kV, uma vez que ha\u0301 dificuldades para novas expanso\u0303es nas SEs existentes de Luzia\u0302nia e Samambaia. Propicia ao sistema ele\u0301trico de 500 kV de suprimento a\u0300 capital Goia\u0302nia o atendimento ao crite\u0301rio diferenciado N-2, quando da perda da LT 500 kV Trindade-Rio Verde Norte de circuito duplo.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>2<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 500 kV Morro do Chape\u0301u II &#8211; Poc\u0327o\u0303es III C1, com 356 km;<\/p>\n<p>\u2013 LT 500 kV Poc\u0327o\u0303es III &#8211; Medeiros Neto II C1, com 329 km;<\/p>\n<p>\u2013 LT 500 kV Medeiros Neto II &#8211; Joa\u0303o Neiva 2 C1, com 282 km;<\/p>\n<p>\u2013 LT 230 kV Medeiros Neto II &#8211; Teixeira de Freitas II, CD, C1 e C2, com 59 km;<\/p>\n<p>\u2013 SE 500\/230 kV Medeiros Neto II &#8211; (3+1 Res) x 100 MVA e Compensac\u0327a\u0303o Si\u0301ncrona (-180\/300) Mvar.<\/td>\n<td>\n<p align=\"center\">BA<\/p>\n<p align=\"center\">ES<\/p>\n<p align=\"center\">MG<\/p>\n<\/td>\n<td nowrap=\"nowrap\">\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Escoamento na A\u0301rea Sul da Regia\u0303o Nordeste e atendimento a\u0300 carga no extremo sul da Bahia.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>3<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 345 kV Norte &#8211; Miguel Reale, C3 e C4, com 14,5 km cada (subterra\u0302nea).<\/td>\n<td>\n<p align=\"center\">SP<\/p>\n<\/td>\n<td>\n<p align=\"center\">54<\/p>\n<\/td>\n<td>Ampliac\u0327a\u0303o da rede de transmissa\u0303o para atendimento a\u0300s regio\u0303es Norte, Sul e Leste do munici\u0301pio de Sa\u0303o Paulo.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>4<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 230 kV Porto Alegre 1 &#8211; Porto Alegre 9 C1, com 9 km (subterra\u0302nea);<\/p>\n<p>\u2013 LT 230 kV Capivari do Sul &#8211; Oso\u0301rio 3, C1, com 28,83 km;<\/p>\n<p>\u2013 LT 230 kV Guai\u0301ba 3 &#8211; Charqueadas 3, C1, 10,24 km;<\/p>\n<p>\u2013 LT 230 kV Guai\u0301ba 3 &#8211; Po\u0301lo Petroqui\u0301mico, C1, com 33,07 km;<\/p>\n<p>\u2013 SE 525 kV Guai\u0301ba 3 &#8211; Compensac\u0327a\u0303o Esta\u0301tica, 1 x (-180\/+300) Mvar.<\/p>\n<p>\u2013 SE 230\/69 kV Charqueadas 3 &#8211; 2 x 150 MVA;<\/p>\n<p>\u2013 Trechos de LT 230 kV entre a SE Charqueadas 3 e a LT Cidade Industrial &#8211; Charqueadas, com 1 x 5,46 km (subterra\u0302nea). O trecho entre o ponto de seccionamento e a SE Charqueadas sera\u0301 desativado;<\/p>\n<p>\u2013 Trechos de LT 230 kV entre a SE Charqueadas 3 e a LT Santa Cruz &#8211; Charqueadas C1, com 1 x 5,46 km (subterra\u0302nea). O trecho entre o ponto de seccionamento e a SE Charqueadas sera\u0301 desativado.<\/td>\n<td>\n<p align=\"center\">RS<\/p>\n<\/td>\n<td>\n<p align=\"center\">54<\/p>\n<\/td>\n<td>Atendimento Ele\u0301trico ao Estado do Rio Grande do Sul: Regia\u0303o Metropolitana de Porto Alegre.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>5<\/strong><\/p>\n<\/td>\n<td>\u2013 SE 230\/13,8 kV Porto Alegre 4 &#8211; revitalizac\u0327a\u0303o completa da subestac\u0327a\u0303o, com substituic\u0327a\u0303o dos mo\u0301dulos de conexa\u0303o e barramentos em 230kV e 13,8 kV e novas unidades de transformac\u0327a\u0303o 230\/13,8kV &#8211; 5 x 75 MVA.<\/td>\n<td>\n<p align=\"center\">RS<\/p>\n<\/td>\n<td>\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Revitalizac\u0327a\u0303o completa de instalac\u0327o\u0303es em final de vida u\u0301til para manutenc\u0327a\u0303o e ampliac\u0327a\u0303o no atendimento Ele\u0301trico a\u0300 Regia\u0303o Metropolitana de Porto Alegre.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>6<\/strong><\/p>\n<\/td>\n<td>\u2013 SE 230\/138 kV Cachoeirinha 3 &#8211; (9+1R) x 55 MVA;<\/p>\n<p>\u2013 Trechos de LT em 230 kV entre a SE Cachoeirinha 3 e a LT Gravatai\u0301 2 \u2013 Canoas 2\u2013 C1, 2 x 2,5 km;<\/p>\n<p>\u2013 Trechos de LT em 230 kV entre a SE Cachoeirinha 3 e a LT Gravatai\u0301 2 \u2013 Cidade Industrial \u2013 C2, 2 x 2,5 km.<\/td>\n<td>\n<p align=\"center\">RS<\/p>\n<\/td>\n<td>\n<p align=\"center\">42<\/p>\n<\/td>\n<td>Atendimento a\u0300s cargas da regia\u0303o do Vale dos Sinos do estado do Rio Grande do Sul.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>7<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 345 kV Miguel Reale &#8211; Sa\u0303o Caetano do Sul, C1 e C2, com 7,8 km (subterra\u0302nea);<\/p>\n<p>\u2013 LT 345 kV Sa\u0303o Caetano do Sul &#8211; Sul, C1 e C2, com 14,5 km (subterra\u0302nea);<\/p>\n<p>\u2013 SE 345\/88 kV Sa\u0303o Caetano do Sul x (6+1R) x 133,33 MVA;<\/p>\n<p>\u2013 Trechos de LT em 345 kV entre a SE Sul e a LT 345 kV Ibiuna &#8211; Tijuco Preto C2, com 9 km.<\/td>\n<td>\n<p align=\"center\">SP<\/p>\n<\/td>\n<td>\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Ampliac\u0327a\u0303o da rede de transmissa\u0303o para atendimento a\u0300s regio\u0303es Norte, Sul e Leste do munici\u0301pio de Sa\u0303o Paulo.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>8<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 345 kV Norte &#8211; Sa\u0303o Miguel, C1 e C2, com 8,1 km (subterra\u0302nea);<\/p>\n<p>\u2013 LT 345 kV Sa\u0303o Miguel &#8211; Ramon, C1 e C2, com 9,1 km (subterra\u0302nea);<\/p>\n<p>\u2013 SE 345\/88 kV Sa\u0303o Miguel &#8211; (9+1R) x 133,33 MVA.<\/td>\n<td>\n<p align=\"center\">SP<\/p>\n<\/td>\n<td>\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Ampliac\u0327a\u0303o da rede de transmissa\u0303o para atendimento a\u0300s regio\u0303es Norte, Sul e Leste do munici\u0301pio de Sa\u0303o Paulo.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>9<\/strong><\/p>\n<\/td>\n<td>\u2013 SE 230\/138 kV Iguatemi 2, 2 x 150 MVA;<\/p>\n<p>\u2013 Trechos de LT em 230 kV entre a SE Iguatemi 2 e a LT Guai\u0301ra \u2013 Dourados C1, 2 x 3 km.<\/td>\n<td>\n<p align=\"center\">MS<\/p>\n<\/td>\n<td>\n<p align=\"center\">42<\/p>\n<\/td>\n<td>Obras estruturais para o sistema ele\u0301trico que supre a regia\u0303o sul do Mato Grosso do Sul de forma a viabilizar um atendimento ele\u0301trico adequado ao crescimento do mercado local e mitigando problemas pontuais de suprimento nos pro\u0301ximos anos, em especial, na rede de distribuic\u0327a\u0303o em 138kV que e\u0301 atendida a partir da subestac\u0327a\u0303o Guai\u0301ra.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>10<\/strong><\/p>\n<\/td>\n<td>\u2013 LT 230kV Fortaleza II \u2013 Dias Macedo II, C1 e C2, com 7,6 km (trechos subterra\u0302neos);<\/p>\n<p>\u2013 SE 230\/69 kV Dias Macedo II ,3 x 200 MVA.<\/td>\n<td>\n<p align=\"center\">CE<\/p>\n<\/td>\n<td>\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Ampliac\u0327a\u0303o da rede de transmissa\u0303o da Regia\u0303o Metropolitana de Fortaleza-CE, de forma a atender o crescimento de carga previsto para o peri\u0301odo 2024-2033.<\/td>\n<\/tr>\n<tr>\n<td nowrap=\"nowrap\">\n<p align=\"center\"><strong>11<\/strong><\/p>\n<\/td>\n<td>\u2013 Incorporac\u0327a\u0303o dos ativos em servic\u0327o designado a\u0300 AmGT pela Portaria do MME no 706, de 15 de dezembro de 2016;<\/p>\n<p>\u2013 Revitalizac\u0327a\u0303o das subestac\u0327o\u0303es em 230 kV Manaus, Cristiano Rocha e Lechuga (setor designado a\u0300 AmGT);<\/p>\n<p>\u2013 Substituic\u0327a\u0303o da SE Balbina 230kV em arranjo disjuntor e meio por outra SE nova 230kV em arranjo barra dupla 4 chaves;<\/p>\n<p>\u2013 Substituic\u0327a\u0303o do pa\u0301tio de 69kV em arranjo anel da SE Manaus por outro pa\u0301tio novo de 69kV em arranjo BD4 e,<\/p>\n<p>\u2013 Empreendimentos novos:<\/p>\n<p>\u2013 LT 230 kV Lechuga \u2013 Taruma\u0303, CD, C1 e C2, com 12,2 km (trechos ae\u0301reos e subterra\u0302neos);<\/p>\n<p>\u2013 SE 230\/138 kV Taruma\u0303 &#8211; (6+1Res) x 100 MVA;<\/p>\n<p>\u2013 SE 230\/69 kV Presidente Figueiredo &#8211; 2 x 50 MVA;<\/p>\n<p>\u2013 Trechos de LT em 230 kV entre a SE Presidente Figueiredo e os pontos de seccionamento da LT Balbina \u2013 Cristiano Rocha, C1, com 2 x 4,5 km.<\/td>\n<td>\n<p align=\"center\">AM<\/p>\n<\/td>\n<td>\n<p align=\"center\">60<\/p>\n<\/td>\n<td>Revitalizac\u0327a\u0303o e continuidade da prestac\u0327a\u0303o do servic\u0327o pu\u0301blico de transmissa\u0303o das instalac\u0327o\u0303es existentes para atendimento a\u0300 regia\u0303o metropolitana de Manaus.<\/p>\n<p>Atendimento ele\u0301trico a\u0300 regia\u0303o metropolitana de Manaus, no estado do Amazonas.<\/p>\n<p>Atendimento ele\u0301trico a\u0300 regia\u0303o de Presidente Figueiredo, no estado do Amazonas.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p><strong>Por: Assessoria de Impresa da Aneel | AID &#8211; Publica\u00e7\u00e3o: 06\/08\/2020 no site da Aneel<\/strong><\/p>\n<div>&nbsp;<\/div>\n<p>Link curto para esta p\u00e1gina:&nbsp;<a href=\"https:\/\/bit.ly\/3a0BSqC\" target=\"_blank\" rel=\"noopener\">bit.ly\/3a0BSqC<\/a><\/p>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A Ag\u00eancia Nacional de Energia El\u00e9trica \u2013 ANEEL aprovou nesta quinta-feira, 6\/8, o Edital do Leil\u00e3o de Transmiss\u00e3o n\u00ba 1\/2020, com previs\u00e3o de R$ 7,4 bilh\u00f5es em investimentos e gera\u00e7\u00e3o<\/p>\n","protected":false},"author":6,"featured_media":43948,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"ngg_post_thumbnail":0},"categories":[40],"tags":[],"_links":{"self":[{"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/posts\/43947"}],"collection":[{"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=43947"}],"version-history":[{"count":0,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/posts\/43947\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=\/wp\/v2\/media\/43948"}],"wp:attachment":[{"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=43947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=43947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sistema.sinergiacut.org.br\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=43947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}